by heclastg | Dec 15, 2023
ABOUT We led a major manufacturing site reconfiguration in Poland with the objective of eliminating material flow bottlenecks, introducing automation, reducing touchpoints and removing fork lifts from the production hall and enabling 24-hour uptime. As a result, Avon...